Qatar Rail – Transit Oriented Development
Location:
6 Metro Stations (Al Sadd, Bin Mahmoud, Doha Jadeeda, Al Waab, West Bay, Legtaifiya)
Client:
Qatar Railways Company
Built up area:
Al Sadd: 190,168 m² | West Bay: 47,948 m² | leqtifiyah: 224,551 m² | Doha Al Jadeeda: 64,053 m² | Bin Mahmoud: 172,221 m²
Scope:
• Master Planning
• Preliminary Traffic Study
• Vehicular Movement Strategy
• Transport Modes Integration
• Pedestrian Circulation Study
• Road Corridor Plan
• Concept Road Design
• Utilities Planning
• Concept Utilities Design
• Architecture & Building Services Detailed Design
• MEP Design – Detailed Design
Status:
Design Completed
AEB provided the design services for Transit Oriented Developments (TOD) for six metro stations covered in this project. It is in line with FIFA 2022 where public transit will be used to serve the high spectators’ demand. These metro stations are already in operation and design challenge was to integrate the TOD design with QRail’s Station Area Plans for these stations. AEB did an integrated planning for the vehicular and pedestrian movements and concept stage designing of roads and utility network.